TECHNICAL · DELIVERY · LEAD ·
iOS · WEB · AUTOMATION · AI · DOCKER · REACT · NODE ·
PRODUCT ARCHITECTURE · TEAM LEADERSHIP · MANAGEMENT ·
0%
←All projects
MedTrack Health OS — Personal AI Health Analytics

MedTrack Health OS — Personal AI Health Analytics

2026Full Cyclemobile

Role

Full cycle: from idea and architecture to development and deployment.

Tech

iOS: SwiftUI, RevenueCat, HealthKit, OneSignal. Backend: Fastify + TypeScript, PostgreSQL, Docker. AI: OpenAI GPT-4o-mini — document parsing, score generation, RAG chat with health context. Architecture: Server-driven UI, A/B experiments with weighted randomization, 23 push scenarios with timezone/cooldown, CI/CD deployment on push to main.

Key features

  • 01Paywall layout
  • 02Paywall type
  • 03Paywall placement
  • 04Onboarding variants
  • 05Purchase journey
01

Problem

People keep health diaries, collect lab results, visit doctors — but the data is scattered across paper notes, PDFs, and chats. Nobody sees the connections between sleep and blood pressure, between medication and wellbeing, between test results and symptoms. A doctor sees a patient for 15 minutes twice a year. The rest of the time, people are on their own — without the tools to understand what's affecting them.

For the business, there's a second problem: health apps lose 80% of users in the first week. Without systematic work on retention and conversion, even a great product doesn't survive.

02

Audience

  • People with chronic conditions — see what triggers flare-ups, arrive at appointments with ready analytics rather than "I think it got worse."
  • Health-conscious users — optimize sleep, stress, and activity through data, not intuition.
  • Patients after medical tests — store results and reports in one place, track biomarker trends on charts.
03

What's different

Manual / Competitors MedTrack
Data spread across notes, Excel, different apps Everything in one place with AI document parsing
"I think it got worse" Objective trends and correlations from your data
Generic advice from the internet AI assistant that knows your health history
Static charts Dynamic dashboard with scores by organ system
Requires discipline and time 30-second check-in, auto-sync with Apple Health
One paywall, hope for the best A/B tests across layout, type, placement with cohort analytics
Push: "Don't forget to open the app" 23 contextual scenarios with escalation and cooldown
Metrics — MAU and DAU Purchase journey, cohort analysis, feature-to-conversion correlation
04

Screenshots

05

Admin Panel

06

Customization

  • 01Tracking modules — toggled from the backend, new ones can be added without an app release.
  • 02Diary fields — server-driven schema: type, validation, order — all managed through the admin panel.
  • 03AI model — switchable via settings (gpt-4o-mini → gpt-4o → any other).
  • 04Paywall — A/B across 3 axes: layout (3 variants) × type (3 variants) × placement (2 variants) = 18 combinations without a release.
  • 05Push scenarios — 23 triggers with configurable cooldown, time windows, and conditions.
  • 06Cohort analytics — segmentation across 6 axes: demographics, behavior, time, source, features, subscription.
  • 07Units — metric/imperial, switchable at the user level.

Need something like this?

Tell me about the task — I'll suggest an approach, pick a stack and scope it out.